Testimonials
Testimonials from around the world document how a wide range of companies that
cut shapes and parts have increased productivity and reduced costs with ProMotion
Controls iTechnology.

Numerous Case History snippets have been documented,
with each providing a Case Summary that identifies the company
problem, the ProMotion Control product solution and the resulting
company benefit.

Several newer iReports have also been documented. Newer iReports
also document the company’s initial problem, ProMotion Controls
product solution and the resulting customer benefit but in a
feature story format.

Here are some quotes from these testimonials:

James F. Kemp, Inc.
“With ProMotion Controls equipment, we now cut at faster speeds and with better accuracy. I could not be more pleased with the equipment, the installation or the service.
I would recommend them to anyone.”

Richard Kemp, Vice President

Terra Nova Steel
“iCNC Controllers are as easy to learn and operate
as they are to teach to new operators.”

Rob Gutjahr, General Manager

Scot Forge, Inc.
“Every other shape-cutting control that we considered was missing
at least one or two features that we needed… features that the iCNC Control had.”

Ron Hahn,Manager of Engineering

AGCO Corporation
“We initially figured that the iCNC would pay for itself in 3-1/2 months. Instead, we
found that the controller paid for itself in 2-1/2 months.”

Marty Peterson, Industrial Engineer

Hydro Engineering Inc.
“Aside from its capabilities, I would recommend the iCNC to anyone simply based on the tremendous level of support that we have received from ProMotion Controls personnel.”

James P. McCormick, President

Clervi Marble
“I really enjoy it. The iCNC Control is easy to work and easy to set-up. Plus, it’s easy
to learn and easy to train others.”

John Budesa, Machine Operator

Ferral Components
“The iCNC Control’s Productivity Tools have made a big difference. By using iCNCs on
two machines, both running two shifts, we have saved $360,000 in just two years.”

Jarmo Ainali, President

Case History Snippets
Numerous Case History snippets have been documented, with each providing a
Case Summery that identifies the company problem, the ProMotion Controls
product solution and the resulting company benefit:

AGCO_CorpCH.pdf
ClerviMarbleCH.pdf
FerralComponentsCH.pdf
HydroEngCH.pdf
KempIncCH.pdf
ScotForgeCH.pdf
TerraNovaCH.pdf

i Reports
Several newer iReports have also been documented. Newer iReports provide the initial company problem, the ProMotion Controls product solution and the customer benefit that resulted in a feature story format:

Tubular Framing Inc.
“$16,962.00 annual cost savings
on just one (of many) part nests.”

American Playground
“ The reality ... after about one year of service,
the machine has already paid for itself...
from the parts we now cut ourselves and their
availability to better material management.”

AmPlayiReport.pdf
TubFramiReport.pdf